Active Data Center Upgrade
Daytona Beach, Florida
Client: Confidential
Construction Cost: $15.7 million
Daytona Beach, Florida
Client: Confidential
Construction Cost: $15.7 million
Orlando, Florida
Client: Verizon
Construction Cost: $4 million
This 37,000 square foot two-switch facility, owned by a major telecommunications company, is on a ten acre site including wetlands and a retention pond. Each of the two switch rooms is 2,228 square feet. The first room was […]
Macon, Georgia
Client: Verizon
Construction Cost: $1.25 million
The mission of this project was to provide the mobile telecom switch office (MTSO) with upgraded commercial and emergency power systems capacity and reliability to support the increasing power demands of the digital computerized telecomm equipment. Among other […]
Port St. Lucie, Florida
Client: Confidential
Construction Cost: $3.7 million
This project consisted of a 5,075 square foot addition of equipment space with a design for a future 2nd story. Also included was 510 square feet for an above ground Cable Vault and Utility area to relieve severe cable […]
St. Petersburg, Florida
Client: Confidential
Construction Cost: $5.8 million
This fast-track project included construction of a new 19,000 square foot telecommunications facility for a Fortune 500 Company. The project was completed on schedule and on budget.
Raleigh, North Carolina
Client: Confidential
Construction Cost: $4.25 million
Over the years, the existing seven-story, 301,408 square foot telecommunications facility’s power systems had become antiquated and insufficient to support the new digital technology system. The owner elected to upgrade the power systems by installing new […]
Shreveport, Louisiana
Client: Confidential
Construction Cost: $3.75 million
This new 11,500 square foot state-of-the-art Mobile Telephone Switch Office was completed on a fast-track method. Construction was completed in less than 16 weeks with telecommunications equipment set and prepared for service in less than 26 weeks. All critical service […]
Mobile, Alabama
Client: Confidential
Construction Cost: $2.8 million
This project involved a new 5,800 square foot addition to an existing switch facility. In addition to the new building addition, the project included mechanical and electrical upgrades to the existing facility. This project was completed on schedule and within budget […]
Windermere, Florida
Client: Confidential
Construction Cost: $8.5 million
This renovation of an 83,000 square foot long distance switch facility consisted of completely replacing all mechanical and electrical infrastructure with a new 11,000 square foot building to house the new systems. After installation of the new infrastructure and […]
Gastonia, North Carolina
Client: Confidential
Construction Cost: $860,000
The job scope consisted of the removal of two existing 300 ton chillers and the installation of 1 new 400 ton chiller, 6 pumps and all associated chill and condensing water piping. The old chillers and new one had to […]