Project Description

  • Distribution and Power System Upgrade at Live Plant

  • Mims, Florida

  • Client: Praxair Technology, Inc.

  • Construction Cost: $190,000

Design-build services for electrical services distribution and power systems upgrade at a live manufacturing plant.  Renovations were completed for two new modules in support of upgrading their medium voltage substation.  We designed and constructed conditioned space to accommodate the new transformer and distribution switchgear.  All work was completed with no unscheduled shutdowns or disruption of business operation.