Cartersville, GA | Doehler, USA

The new addition at Doehler USA required an 18,000-sf demolition to install a custom stainless-steel trench floor drain system. The foundation also included constructing a 4’ thick slab to support several raw material bulk storage tanks. Infrastructure components were installed comprising of a large boiler, de-air station, large chiller and pumps and associated piping for chilled water loop. To maintain a clean environment and limit particulates, Duffey fitted the production area with a live steam wash-down, high speed doors, vinyl ceiling tiles, waterproof light fixtures and stainless steel ductwork/vents. The enclosure also featured foam insulated metal panels with flashing for food grade production. During construction, the team built a stainless-steel pipe bridge to carry process stainless steel piping and utility piping to production equipment.