Jacksonville, FL | Confidential Client

Project consisted of providing a standby generator and fuel tank system to support the facility during the required construction process, removal of (2) 2 meg EMD’s (locomotive engines); construction of a 1328 SF galvanized structural steel louvered attenuated intake\exhaust plenum addition; installation of (3) new CAT 2 meg generators, new 4000A paralleling switch gear, transfer switches, buss duct alterations, fuel specialty additions, BAS controls\alarms\remote functioning and finishes. Project completed below budget and as scheduled.